Guide · Hiring a contractor · Omaha metro

Questions to ask a contractor
before hiring

The right questions sort contractors faster than any review site: who will actually be in your house, who pulls the permit, what the price includes, and what happens when something changes. Here are the questions to ask a contractor before hiring one around Omaha, why each one matters, and how to check the answers yourself.

Check these before the first meeting

State registration. Nebraska requires every contractor and subcontractor doing business in the state to register with the Nebraska Department of Labor before doing work, and the department's online registry lets you search by business name, city or phone number. Two things to know about it. Registration is a requirement, not a seal of approval; in the department's own words, it "does not ensure quality of work or protect against fraud." And a contractor with employees has to keep a current workers' compensation certificate on file, or it drops off the registered list until a new one arrives.

The exact business name. A contractor working under more than one name needs a separate registration for each, so the name on your contract should match the name on the registry, the name on the permit and the name on your check.

Local licensing. State registration does not replace local licensing or permit rules, the Department of Labor adds. Omaha, for one, licenses building contractors itself, in classes with their own bond and insurance minimums. Ask which local license the contractor holds for your city.

Questions to ask at the walkthrough

1. Who will be on my job every day, and who do I call?

Some companies sell the job and hand it to a crew you have never met, with a project manager in between. Others have the owner on site. Neither is wrong, but you should know which you are buying, and whose phone you call when a question comes up on a Tuesday afternoon.

2. Who pulls the permit, and which inspections will there be?

The answer should be specific: which office issues it, and which inspections come when. A contractor who suggests skipping the permit is telling you how the rest of the job will go. In Omaha, work started before the permit is issued costs four times the regular permit fee. The building permits guide shows who issues what around the metro.

3. Can I see the bid line by line?

One number tells you nothing about what is in it. A line-item bid shows the labor and materials for each part of the job, which items are fixed and which are allowances (a set amount for tile, fixtures or flooring you have not picked yet), and lets you change the scope without starting over.

4. What is not included?

Ask it straight out. Permit fees, hauling away debris, paint, electrical or plumbing changes, an egress window, ductwork, appliance hookups and the final clean are the usual gaps. Two bids are only comparable when they cover the same work, which is why the Attorney General's office suggests getting at least three written estimates for exactly the same job.

5. How do changes work?

Something always changes: a decision you make halfway through, or a surprise behind a wall. Ask how a change gets priced and approved before the work is done, and get it in writing each time.

6. What is the schedule, and what usually stretches it?

A good answer names the long poles: cabinet and window lead times, countertop fabrication, inspections, weather for anything outside. The kitchen remodel timeline shows what that looks like for one kind of job.

7. What is the payment schedule?

The Department of Labor's advice is to avoid large upfront payments and to be suspicious of anyone who demands full or significant payment before starting. The Attorney General's checklist says to negotiate a reasonable down payment, pay in full only when the work is done to your satisfaction, and pay by check or credit card, keeping the receipts.

8. Can I see proof of insurance?

Ask for a certificate of insurance, in writing, before work begins. It is one of the things the Department of Labor tells homeowners to get on paper.

9. Can I talk to a past customer, or see a job like mine?

References are the oldest check there is, and still one of the most useful. Photos of finished work help too, as long as they are the contractor's own jobs.

10. How will you protect the rest of the house?

Plastic and floor protection, where the dust goes, where materials are stored, how the site is left each night, and which bathroom the crew uses. Small questions, but they decide what living through the job feels like.

Contractor red flags

  • Someone shows up at your door or calls out of the blue with a deal (the Department of Labor's first warning).
  • A demand for full or large payment before work starts, or for cash only.
  • No written contract, or blanks left on it; the Attorney General's checklist says to read every contract and fill every blank before you sign.
  • A suggestion to skip the permit.
  • No listing on the state's contractor registry, or a different business name on the contract than on the registry.
  • Pressure to sign today.

If you signed at home

Under Nebraska law, as the Attorney General's checklist puts it, you have the right to cancel a contract within three days if you signed it at your home or at a contractor's temporary location, like a convention center or a restaurant. It is one more reason not to sign anything on the spot.

Remodeling contractor or general contractor?

The words overlap. A remodeling contractor works on existing houses (kitchens, baths, basements, additions) and usually does much of the carpentry with its own crew. A general contractor runs a whole project and hires out most of the trades. Plenty of companies are some of each. The useful question is not the title but this: how much of my job will your own people do, and who are the subcontractors for the rest?

How we answer these

Since you are reading this on our site, here are our answers. Callaway Construction Inc. is owner-run and based in Gretna, building around the Omaha metro since 1995. Chris Cannon bids the job, runs the job and answers the phone. Same crew, same owner on site, same line-item bid. Licensed & insured · Nebraska registered contractor. Our City of Omaha contractor license shows on the city's public license search. We pull the permit and build the inspections into the schedule. Quotes are free, and Chris gets back to you within a business day. Ask him every question on this page at the walkthrough. Start a quote here, or read more about the company first.

Sources

Checked against these official pages on November 12, 2026. Rules change, and your permit office has the last word.

Owner-run since 1995. Chris Cannon bids the job, runs the job and answers the phone. One crew, one point of contact, no surprises.

Check before you sign

  • State registrationNebraska Dept. of Labor
  • Local licenseYour city, if it licenses
  • InsuranceA certificate, in writing
  • BidLine by line
  • PermitWho pulls it
  • PaymentsNo large sum up front
  • Phone(402) 740-6572
Questions we get a lot

Straight answers

How do I check if a contractor is registered in Nebraska?

Search the Nebraska Department of Labor's contractor registry online by business name, city, phone or registration number. Every contractor must register before working in Nebraska, but the department notes that registration does not ensure quality of work or protect against fraud.

Does Omaha require contractors to be licensed?

Omaha licenses building contractors itself, in classes with their own bond and insurance minimums, along with the electrical, plumbing and mechanical trades. State registration does not replace local licensing.

How much should I pay a contractor up front?

As little as reasonable. The Department of Labor warns against large upfront payments, and the Attorney General's checklist says to negotiate a reasonable down payment and pay in full only when the work is done, by check or credit card.

How many bids should I get for a remodel?

The Attorney General's office suggests at least three written estimates, with each contractor bidding on exactly the same work so the numbers compare.

Can I cancel a contract I signed at home?

Yes. You can cancel within three days if you signed at your home or at a contractor's temporary location such as a convention center or restaurant.

What is the difference between a remodeling contractor and a general contractor?

A remodeler works on existing homes and usually does much of the work with its own crew; a general contractor runs a whole project and hires out most of the trades. Ask how much of your job the company's own people will do.

What should I ask a contractor before finishing a basement?

How any moisture will be handled first, where an egress window can go if you want a bedroom, whether there is a bathroom rough-in under the slab, how the rooms will get heating and cooling returns, which inspections there will be, and what the bid covers line by line. The basement checklist walks through each of those.

What should I ask a contractor before a bathroom remodel?

How the shower will be waterproofed behind the tile, how the room will be ventilated, who does the plumbing and electrical, whether a permit is needed, and how long tile and glass take. The bathroom page covers each of those.

Services and guides
Let's talk

Got a project in mind?

Tell us what you're thinking and where the house is. Chris will get back to you within a business day.