
Kitchen remodel cost in Omaha splits into two very different jobs: keeping the layout and updating what you see, or changing the layout and replacing the cabinets. A published 2025 reference prices both for an Omaha kitchen. Here is what each one includes, and what moves a real kitchen above or below them.
The Remodeling 2025 Cost vs. Value Report (www.costvsvalue.com) prices model projects for each metro. Two of them bracket most kitchen jobs. Both assume a 200-square-foot kitchen with 30 feet of cabinets.
Read those for what they are: estimates for two specific scopes, built from building-cost data for the Omaha area. They are not bids, and they are not our prices. Notice too what both models leave out. Their countertops are laminate, and quartz or granite costs more. Neither one moves a wall.
© 2025 Zonda Media, a Delaware Corporation. Complete data from the Remodeling 2025 Cost vs. Value Report can be downloaded free at www.costvsvalue.com.
This is the big one. Keeping the sink, range and refrigerator where they are keeps the plumbing, gas and electrical where they are. Moving them means opening walls and floors, new runs, and an inspection before anything closes up. Taking out a wall adds more, and if the wall is load-bearing it needs a beam sized to carry what the wall carried.
Refacing (new doors and fronts on the old boxes) is the refresh model's choice and the least expensive real change. New stock cabinets come next, then semi-custom, then custom. Semi-custom lines cover most layouts; custom earns its price on odd walls, tall ceilings or a specific look. Cabinets also set the schedule, because nothing is installed until they arrive.
Laminate is in both reference figures. Quartz and granite cost more for the slab and for the fabrication, and they are templated from the installed cabinets, which adds a wait in the middle of the job. An island adds square footage of top, and often seating and an outlet.
Appliances are usually your choice and your allowance, and the range of prices is enormous. A range hood vented outside costs more than a recirculating one. Recessed, pendant and under-cabinet lighting each add circuits and fixtures, and an older panel may need room made for them.
A backsplash behind the counters is modest; tile to the ceiling on a range wall is not. Flooring depends on the material and on whether it runs under the new cabinets or stops at them.
Old wiring, a slow leak, a soft subfloor. Nobody can price those until demo, so a realistic budget leaves room for them.
Omaha lists kitchen remodels as their own permit type, and Gretna requires a permit to remodel a kitchen (swapping cabinets, counters or a sink in the same spot does not need one). The fee is small next to the job: in Omaha's fee table (Omaha Municipal Code section 43-91), a job valued at $75,000 carries a building permit fee of $500.94 plus an 8 percent technology fee, with electrical and plumbing permits on top. The building permits guide covers the rest of the metro.
If resale is part of the reason, the Cost vs. Value Report has a clear answer for Omaha. It estimates the refresh adds $25,851 to resale value, about all of its cost, while the new-layout kitchen adds $30,327, about 40 percent of its cost. The bigger job is for the people who will cook in it for years; the smaller one is the safer bet before a sale.
The kitchen remodel timeline shows how long each kind of job takes, and the kitchen remodeling page shows finished kitchens. For your own number, send a few photos of the kitchen and what bugs you about it. Chris will walk it with you and write a line-item bid you can adjust.
Checked against these official pages on November 12, 2026. Rules change, and your permit office has the last word.
Owner-run since 1995. Chris Cannon bids the job, runs the job and answers the phone. One crew, one point of contact, no surprises.
Real jobs from around the Omaha metro. Tap any photo to open it.
It depends mostly on whether the layout changes. The 2025 Cost vs. Value Report puts a refresh of a 200-square-foot kitchen (new cabinet fronts, appliances, laminate counters, flooring) at $25,769 in Omaha, and a new layout with semi-custom cabinets and an island at $75,488. Those are estimates for model projects, not bids.
Usually the cabinets, then moving plumbing, gas or walls if the layout changes. Countertops and appliances come next, and the spread between basic and high-end choices in each is wide.
Refacing, which keeps the cabinet boxes and replaces the doors, drawer fronts and hardware, costs less and is what the refresh model in the 2025 report assumes. It only works if the boxes are sound and the layout already works.
The 2025 Cost vs. Value Report estimates a midrange kitchen refresh returns about all of its cost at resale in Omaha, and a full new-layout remodel about 40 percent. The rest of the value is in using it.
Usually. Omaha lists kitchen remodels as their own permit type, and new wiring or moved plumbing brings electrical or plumbing permits. In Gretna, swapping cabinets, counters or a sink in the same spot does not need one.
Send photos through the quote page or call (402) 740-6572. Chris walks the kitchen with you and writes a line-item bid you can adjust.
Tell us what you're thinking and where the house is. Chris will get back to you within a business day.